Number of section and floors:
1 sections; 24 floors
Exterior walls:

Prefabricated ferroconcrete:

  • 160 mm thick with exterior insulation system on external ventilated facades;
  • 3-layered, 300 mm thick,painted (at the loggias
Interior walls:
Prefabricated ferroconcrete, 160 mm thick
Partition walls:
ferroconcrete, 80, 60 mm thick
Overlapping:
Prefabricated ferroconcrete, 160 mm thick
Loft (attic):
cold
Roof:
Roll coating
Rainwater drainage:
interior
Characteristics of fire prevention measures:
  • Lighting of stairs - natural, at night time –  electric;
  • Antismoke protection – according to the project;
  • Installed fire extinction pipes on every floor and in bathrooms in the apartments (FEP) ;
  • Fire extinction automatic system
Number of elevators:
  • 2 elevators with capacity for 400 kg;
  • 1 elevator with 1000 kg capacity (also for firemen transportation).
Floor height:
2,80m ( floor to floor).
Additional interior works:
  • Main entrance to the apartment –  metal,shockproof;
  • Interior doors in the apartment – wooden frame MDF lined;
  • Windows and balcony doors – plastic with double glazing.
Interior finishing works in the apartments:

Rooms, living rooms , halls and hallways:

  • floor – oilcloth;
  • walls –  wallpaper;
  • ceiling –  paste whitewash.

Kitchen:

  • floor - oilcloth;
  • walls – washable wallpaper;
  • ceiling – paste whitewash.

Bathrooms (joined bathroom, lavatory,toilet):

  • floor – hydro isolation and ceramic tiling;
  • walls and ceiling – finishing interior works not made.
Bathroom equipment :

1-room apartments  - 1 steel bath,  1 wash basin, 1 toilet;

2-room apartments  - 1 steel bath, 2 wash basins, 1 toilet;

3-room apartments – 1 steel bath, 2 wash basins, 2 toilets:

  • wash sinks in the kitchen are not installed;
  • stop bathroom armature and ball valves are installed
Towel dryers:
Electric, not installed. In the bathrooms and joined bathrooms an electric socket for the dryer is installed.
Type of oven:
Electric, not installed.
Wiring:
Made of copper wire with installation o sockets and switches.
Telephone cable, TV:
Hose (connection) performed to the boards on each floor. Connection with the apartment and the interior layout not made.
Heating system:

From heat-generating installation on the roof. Two- piped dual-zoned wiring:

  • first zone – 1 – 12 floors, low wiring system,
  • second zone – 24 – 13 floors, upper wiring system.
The hose of heating system made to every apartment of polyethylene  pipes in the floor construction.
Type of heating device:
steel radiators
Ventilation system:
Mandatory in the kitchen and in bathrooms wall ventilators are installed.
Cold water supply:

Two-zoned.

  • Firstzone – 1 – 12 floors, with lower dilution of supply pipelines from the basement to the risers located in each apartment bathroom;
  • secondzone – 24 – 13 floors, with upper dilution of supply pipelines from the attic to the apartment risers located at the bathrooms.
Hot water supply:

From heat-generating installation on the roof. Dual- zoned wiring:

  • Firstzone – 1 – 12 floors with low dilution of pipelines to the apartment risers located in the bathroom of each apartment;
  • secondzone – 24 – 13 floors with upper dilution of pipelines from the attic to the apartment risers located in the bathroom of the apartments

 

Installment and settlement of the Counters:
  • electricity –  each apartment, located in the corridors of every floor;
  • cold and hot water – each apartment;
  • heating – located on the common hall blocks for every apartment and one  built-in counter.
Finishing works on the common halls:

Elevator hall, corridors and stairs:

  • stairs floor –  concrete finish;
  • corridor and elevator hall floor –  ceramic tiling;
  • elevator hall walls on the 1st floor –  ceramic tiling;
  • corridor and elevator hall walls at the common floors – water resistant paint;
  • ceiling – paste whitewash;
  • entering doors to the building – aluminum glazed;
  • interior doors –wooden;
  • windows –  wooden and metal glazing.
Embellishment:
  • exterior lighting – according to the project;
  • roads, pavements, pedestrian paths – asphalt coating and FEM coating;
  • recreation areas: active rest, playground, temporary parking for vehicles.
Attention to the investors!
  1. It is forbidden to dismantle independently the constructive elements of the object, interior and exterior works and change the engineering communications.
  2. During the construction process the developer has the right to add/ change elements in the design and technological solutions of the residential building that do not degrade its consumer qualities and do not lead to violation of sanitary norms.
  1. The total plot of the apartment is approximate; final calculations should be made according to the official data of technical inventory.