Technical characteristics

                                                                           Technical characteristics
                                                                            Apartment house №5

Number of sections and floors:

1 section, 24 floors,

– 1st floor –office areas ;
– 2-24 floors – one-level apartment (23-24 floors - two-level apartments).

Structure scheme:

monolithic ferroconcrete frame.

Walls:
exterior – ceramic brick 250 mm thick, and monolithic ferroconcrete thick 300 mm,with external insulation system over the external system of ventilated facades, in loggias and balconies – external insulation system and with decorative plaster finish; interior between apartments – ferroconcrete 250 and 300 mm thick; made of small size materials 250 and 300 mm thick.

Partition walls: made of small size materials 100 and 115 mm thick.

Floor height: 

3,00 m (floor to floor).

Overlapping:

monolithic ferroconcrete 200mm thick. Іn apartments in overlapping floor construction is done.In the apartments` bathrooms hydro isolation system is made.

Roof: flat, roll coating.

Rainwater drainage: interior.

Characteristics of fire prevention measures:

Lighting of stairs - daylight, at night time –  electric;
Antismoke protection – according to the project;
Installed fire extinction pipes on every floor;
Installed fire extinction pipes in bathrooms in the apartments (FEP).

Garbage chute (location):

garbage receiver – on each floor (except 1st floor) ;
collecting bin – on the 1st (ground) floor.

Number of elevators– 3:

2 elevators 400kg capacity ;
1 elevator 1000 kg capacity (also for firemen transportation).

Additional interior works:

Entrance door to the apartment –  metal,shockproof;
Windows and balcony doors – plastic with double glazing;
Interior doors - not established.

Interior finishing works in the apartments:

not made.

Bathroom equipment :

not installed.

Towel dryers:

electric, not installed. In the bathrooms and joined bathrooms an electric socket for the dryer is installed.

Type of oven:

electric, not installed.

Wiring:


made of copper wires with installation of sockets and switches

Network TV:

Wires (connection) performed to the boards on each floor at the corridor of common use. Connection to the apartment and interior layout not made.

Heating system:

Two- piped dual-zoned wiring, with low dilusion:

first zone
– 1 – 12 floors,
second zone – 13 – 24 floors.The main pipelines are laid under the ceiling of the basement.
Apartment plating of the heating system from polyethylene pipes is carried out in the construction of apartment floors.
In the two-level apartments to the second level, the rise of the heating system is carried out from the first level.

Type of heating device:

steel radiators

Ventilation system:

Mandatory, in the kitchen and in bathrooms wall ventilators are installed. Each appartament on the facade of the building will have a place prepared for the installation of the outer block of air conditioner (bracket, screen and hole). The air conditioner is not installed.

Cold water supply:

Two-zoned.

First zone – 1 – 12 floors inclusively (water supply - ascendant) ;
Second zone – 23 – 13 floors, inclusively (water supply  - descendant).

Second zone pipelines laid under the ceiling of corridors of common use on the 23 th floor. To the bathrooms on the 24th floor of two-tiered apartments, water is served through the bathrooms on the 23 rd floor.

Hot water supply:

Dual- zoned :

The first zone - 12 - 1 floor inclusive (water supply - descendant). The first zone pipelines, laid under the ceilings of public corridors on the 12th floor.
Second zone - 23 - 13 floors inclusive (water supply - descendant). Pipelines located under the ceiling of common corridors on the 23th floor.To the bathrooms on the 24th floor of two-level apartments, water is served through the bathrooms 23rd floor.
Round pipes of the second zone are located under the ceiling of common corridors on the 13th floor.
Each apartment for the dilution of hot and cold water from pipes placed in the public corridors, bathrooms and kitchen to the apartments is made of polyethylene pipes in the floors of structures.

Counters for each apartment:

cold and hot water;
electricity;
heating.
Located in the corridors of common use blocks.

Finishing works on the corridors of common use:
Elevator hall, corridors of common use and stairs:

stairs floor –  concrete finish;
corridor of common use and elevator hall floor –  ceramic tiling;
elevator hall walls on the 1st floor –  ceramic tiling;
corridor of common use  and elevator hall walls at the typical floors – water resistant paint;
ceiling – paste whitewash;
entrance doors to the building – aluminum glazed;
interior doors –wooden;
windows – metal glazing.

Embellishment:

exterior lighting – according to the project;
roads, pavements, pedestrian paths – asphalt coating and FEM coating;
recreation areas: active rest, playground, temporary parking for vehicles.

                                                                       Attention to the investors!

1. It is forbidden to dismantle independently the constructive elements of the object, interior and exterior works and change the engineering communications.

2. During the construction process the developer has the right to add/ change elements in the design and technological solutions of the residential building that do not degrade its consumer qualities and do not lead to violation of sanitary norms.

3. The total area of the apartment is approximate; final calculations should be made according to the official data of technical inventory.