Technical characteristics

TECHNICAL CHARACTERISTICS
Residential building №19
Sections 1, 2 – apartments on 1-22 floors
Section 3 – apartments on 1-24 floors
 
(information on the technical characteristics of the construction object and objects of investment in the construction site; a brief list of works at the construction site and adjoining territory; a brief list of construction works at the investment object)
 
Number of sections and floors: 3 sections; 24 floors.
 
section 1, 2  -   1-22 floors – apartments;
- 23-24 floors – pent-house apartments.
section 3     -   1-24 floors – apartments (office areas on the 1st floor).
 
Walls:
Exterior –mounted ferroconcrete panels160 mm width, insulated, plastered and painted.
Betweensections – mounted 3-layered panels 300 mm wide.
Interior–mounted ferroconcrete panels160 mm and 80 mm wide.
Partitionwalls –small-plaster panels 80 mm wide.
 
Overlap: mounted ferroconcrete panels 160 mm width.

Ceiling: combined (sections 1 and 2)
 
Attic: cold (section 3).
 
Fire prevention characteristics:

— Stairs illumination – daylight, night time - electric;
— Antismoke protection – according to the project;
— Installed fire extinction pipes on every floor (FEP)
— Fire extinction automatic system.

 Number of elevators: 2(in each section)

— 2 elevators with 400 kg capacity;
— 1 elevator with capacity 1000 kg capacity


Floor height:
2,80m ( floor to floor).
 
Slot filling:
— entrance door to the apartment –  metal,shockproof;
— Interior doors in the apartment – wooden frame MDF lined;
— Windows and balcony doors – plastic with double glazing;
— Glazing of balconies and lodge areas – plastic with single layer glazing.
Interior finishing works in the apartments:
— Floor – linoleum
— Walls – wallpaper
— Ceiling – paste whitewash
 
Bathrooms (combinedbathroom and toilet.):
— floor – water resistant and tiling works made;
— walls and ceiling -  not made;
 
Sanitary equipment:
1-room apartments - 1 bath steel, 1 wash basin, 1 toilet;
2-room apartments - 1 bath steel, 2 washbasins, 1 toilet;
3-room apartments - 1 bath steel, 2 washbasins, 2 toilets;
— Sinks in kitchens are not installed;
— shut-off sanitary fixtures, ball valves are installed.
 
Towel dryers: electric, not installed. In the bathrooms and in the combinedbathrooms an electric outlet for the dryer is installed.
 
Type of stove/oven: electric stoves, not installed.
 
Wiring: Copper wire, with sockets and switches. The socket for an electric stove is not installed.
Television networks: lining is performed on distribution boards located on each floor of public corridors, input to the apartment - is not fulfilled.
 
Heating system:
 
from autonomous roof boiler house (ADC), located on the roof of Section 3.
Two-pipe, two-zone;
— the first zone - with the lower breeding of highways: from the 1st to the 12th floors;
— the second zone - with the lower cultivation of highways: from the 13th to the 24th floors.
Apartment plating of the heating system from polyethylene pipes is carried out in the floor construction from risers located in common use corridor cabinets.
 
Type of heating devices: steel radiators.
 
Ventilation system: obligatory, in the kitchen and in the bathrooms wall fans are installed.
For each apartment, on the facade, a place is set for the installation of an external unit of the air conditioner (brackets with a screen and hole). Air conditioners are not installed.
 
The system of cold water supply: a two-zone.
      The first zone - from the 1st to the 12th floor inclusive.
      The second zone - from the 24th to the 13th floor inclusive. The supply pipelines are laid under the ceiling of the 24th floor common use corridor.
 
Hot water supply system: two-zone.
      The first zone - from the 12th to the 1st floor inclusive. Supply pipelines are laid under the ceiling of the public corridor on the 12th floor.
      The second zone - from the 24th to the 13th floor inclusive. The supply pipelines are laid under the ceiling of the 24th floor common use corridor.
    Circulating pipelines of the second zone are laid under the ceiling of the public corridor on the 12th floor.
Apartment-breeding of cold and hot water supply systems: from risers located in common use corridor cabinets, is made of polypropylene pipes in the structure of the floor of the apartments, and on the walls of the bathrooms.

Counters for each apartment:

— cold and hot water;
— electricity;
— heating

Located in the corridors of common use blocks.

Finishing works on the corridors of common use: 

Elevator hall, corridors of common use and stairs:
stairs floor –  concrete finish;
— corridor of common use and elevator hall floor –  ceramic tiling;
— elevator hall walls on the 1st floor –  ceramic tiling;
— corridor of common use  and elevator hall walls at the typical floors – water resistant paint;
— ceiling – paste whitewash;
— entrance doors to the building – aluminum glazed;
— interior doors –wooden;
— windows – metal glazing.

Embellishment:

— exterior lighting – according to the project;
— roads, pavements, pedestrian paths – asphalt coating and FEM coating;
— recreation areas: active rest, playground, temporary parking for vehicles.

                                                                                                Attention to the investors!

1. Itisforbiddentodismantleindependentlytheconstructiveelementsoftheobject, interior and exterior worksandchangetheengineeringcommunications.

2. Duringtheconstructionprocessthedeveloperhastherighttoadd/ changeelements in the design and technological solutions of the residential building that do not degrade its consumer qualities and do not lead to violation of sanitary norms.

3. The total area of the apartment is approximate; final calculations should be made according to the official data of technical inventory.