Technical characteristics

TECHNICAL CHARACTERISTICS
Residential building №4 (sections А, B, V, G)

(information on the technical characteristics of the constrution object and objects of investment in the construction site; a brief list of works at the construction site and adjoining territory; a brief list of construction works at the investment object)

Number of sections and floors: 4 sections, 15-storey building with basement floor.
  Section A:
- ground floor - technical premises and offices;
- 1-14 floors - apartments;
- 15th floor - technical premises and the second level of apartments.
  Section B:
- ground floor  - technical premises;
- 1st floor - apartments and office premises;
- 2 - 14 floors - apartments;
- 15th floor - technical premises and the second level of apartments.
  Section V:
- ground floor - technical and office premises;
- 1-14 floors - apartments;
- 15th floor - technical premises and the second level of apartments.
  Section G:
- ground floor  - technical and office premises;
- 1-14 floors - apartments;
- 15th floor - technical premises and the second level of apartments.

Walls:
Floors 1-14:
External - brick 250 mm thick, plastered from the apartment, and monolithic reinforced concrete, thickness of 200 mm and 250 mm. Exterior - insulated, plastered and painted.
Interior walls  - brick with a thickness of 250 mm, plastered, and reinforced concrete, with a thickness of 250 mm.
15 th floor
External - brick thickness 250 mm, not plastered from the premises; and monolithic reinforced concrete, thickness 200 mm and 250 mm. Externally insulated, plastered and painted.
The interior walls are reinforced concrete with a thickness of 250 mm and brick with a thickness of 250 mm, not plastered.

Partitions (1-14 floors): from small-sized materials of thickness of 120 mm, not plastered.

Height: 1-14 floors - 3,3 m (floor to floor
              15th floor - 2.1m ( floor to ceiling).

Overlap :  monolithic reinforced concrete, width 200 mm. In the apartments by overlap, the construction of floors, except for bathrooms. In sanitary rooms of flats, waterproofing is carried out. On the 15th floor, the construction of the floor and waterproofing is not carried out.

Ceiling: flat, rolled , insulated.

Fire prevention characteristics:
- Stairs illumination – daylight, night time - electric;
- Antismoke protection – according to the project;
- Installed fire extinction pipes on every floor (FEP)- floors -1-14th
- Fire extinction automatic system - floors -1-14th

Number of elevators: 2 (in each section – last floor- 14th)

- 1 elevators with 400 kg capacity;
- 1elevator with capacity 1000 kg capacity

Slot filling:

- entrance door to the apartment –  metal,shockproof;

- Interior doors in the apartment – not installed;

- Windows and balcony doors – plastic with double glazing;

Stairs in penthouse apartments: from a rough board on a metal module.

Interior finishing works in the apartments:  not made

Bathroom: not made or installed ;

Towel dryers: electric, not installed. In the bathrooms and in the combinedbathrooms an electric socket for the dryer is installed.

Type of stove/oven: electric stoves, not installed.

Wiring: Copper wire, with sockets and switches from 1-14 th floor.

Television networks: lining is performed on distribution boards located on each floor of public corridors, entrance to the apartment - is not made.

Heating system: Heating system: from a gas boiler house, attached to a residential building №20. Two-pipe coupler, with low-level lines, laid in the technical premises of the ground floor. Apartment heating system is made of polyethylene pipes:
1 - 14 floors - in the construction of the floor;
15th floor - by overlapping.

Type of heating devices: steel radiators.

Ventilation system: obligatory, in the kitchen and in the bathrooms wall fans are installed.

The system of cold water supply: One-zone, with the upper dilution of supply pipelines, laid under the ceiling of the corridor of general use of the 14th floor.

Hot water supply system:
from a gas boiler house, attached to a residential building №20. The single-zone deployment, with the upper dilution of supply pipelines, laid under the ceiling of the corridor of general use of the 14th floor.
The apartment connection of cold and hot water supply systems is carried out from risers, which are located in common floor corridor cabinets of 1 - 14 floors.
At the second level of flats (15th floor) there are places of connection to cold, hot water supply and sewage.

Counters for each apartment   (Located in the corridors of common use blocks.):

- cold and hot water;

- electricity;

- heating

Finishing works on the corridors of common use:

Elevator hall, corridors of common use and stairs:

- stairs floor –  concrete finish;
- corridor of common use and elevator hall floor –  ceramic tiling;
- elevator hall walls on the 1st floor –  ceramic tiling;
- corridor of common use  and elevator hall walls at the typical floors – water resistant paint;
- ceiling – paste whitewash;
- entrance doors to the building – aluminum glazed;
- interior doors –metalic;
- windows – metal glazing.

Embellishment:

- exterior lighting – according to the project;
- roads, pavements, pedestrian paths – asphalt coating and FEM coating;
- recreation areas: active rest, playground, temporary parking for vehicles.

                                                                                      Attention to the investors!


1. Itisforbiddentodismantleindependentlytheconstructiveelementsoftheobject,interior and exterior worksandchangetheengineeringcommunications.

2. The owner of the property shall bear responsibility for the results of independent work on the installation of external hinged constructions and technical equipment, as well as for the consequences of violation of the integrity of the front and external walls of the building.

3. Duringtheconstructionprocessthedeveloperhastherighttoadd/ changeelements in the design and technological solutions of the residential building that do not degrade its consumer qualities and do not lead to violation of sanitary norms.

4. The total area of the apartment is approximate; final calculations should be made according to the official data of technical inventory.